•  
     
    Second Floor with Inside
    Saturday, May 06 2006 @ 07:30 PM EDT
  •  
     
    Second Floor Done (this version ended up being too big and was disassembled)
    Saturday, May 06 2006 @ 07:30 PM EDT
  •  
     
    Current Smaller Version with Roof and Steeple (almost done!)
    Friday, June 02 2006 @ 05:00 PM EDT
  •  
     
    Front of Current Version
    Friday, June 02 2006 @ 05:01 PM EDT
  •  
     
    Rip with Franklin St. Church in Enfield
    Friday, June 02 2006 @ 05:01 PM EDT
  •  
     
    Finished Product!
    Saturday, June 10 2006 @ 03:49 PM EDT
  •  
     
    On the Deck
    Sunday, June 11 2006 @ 04:03 PM EDT
  •  
     
    Front of Church
    Sunday, June 11 2006 @ 04:04 PM EDT
  •  
     
    The Graveyard
    Sunday, June 11 2006 @ 04:05 PM EDT
Jump to
Album ID: 140